51猎奇入口

Skip to main content
Department Of Physics text logo
  • Research
    • Our research
    • Our research groups
    • Our research in action
    • Research funding support
    • Summer internships for undergraduates
  • 51猎奇入口
    • Undergraduates
    • Postgraduates
  • Engage
    • For young people
    • For teachers
    • For the public
    • For alumni
    • For business
  • Support
Menu
Insertion of STC into TRT at the Department of Physics, Oxford
Credit: CERN

Philip Burrows

Professor of Physics

Sub department

  • Particle Physics
Philip.Burrows@physics.ox.ac.uk
Telephone: 01865 (2)73451
Denys Wilkinson Building, room 615a
  • About
  • Publications

Transverse Beam Jitter Propagation in Multi-bunch Operation at ATF2

Proceedings of IPAC2011, San Sebasti谩n, Spain (2011) 1320-1320

Authors:

Javier Resta-Lopez, others

Transverse beam jitter propagation in multi-bunch operation at ATF2

(2011)

Authors:

PN Burrows, J Resta-Lopez, J Alabau-Gonzalvo, B Constance

Abstract:

Pulse-to-pulse orbit jitter, if not controlled, can drastically degrade the luminosity in future linear colliders. The second goal of the ATF2 project at the KEK accelerator test facility is to stabilise the vertical beam position down to approximately 5% of the nominal rms vertical beam size at the virtual Interaction Point (IP). This will require control of the orbit to better than 1 micrometre at the entrance of the ATF2 nal focus system. In this paper, by means of computer simulations, we study the vertical jitter propagation along the ATF2 from the start of the extraction line to the IP. For this study pulse-to-pulse vertical jitter measurements using three stripline beam position monitors are used as initial inputs. This study is performed for the case of a bunch-train with three bunches, but could easily be extended for a larger number of bunches. The cases with and without intra-train orbit feedback correction in the extraction line of ATF2 are compared.

The beam-based intra-train feedback system of CLIC

IPAC 2010 - 1st International Particle Accelerator Conference (2010) 2791-2793

Authors:

J Resta-L贸pez, PN Burrows

Abstract:

The design luminosity of the future linear colliders requires transverse beam size at the nanometre level at the interaction point (IP), as well as stabilisation of the beams at the sub-nanometre level. Different imperfections, for example ground motion, can generate relative vertical offsets of the two colliding beams at the IP which significantly degrade the luminosity. In principle, a beam-based intra-train feedback system in the interaction region can correct the relative beam-beam offset and steer the beams back into collision. In addition, this feedback system might considerably help to relax the required tight stability tolerances of the final doublet magnets. For CLIC, with bunch separations of 0.5 ns and train length of 156 ns intra-train feedback corrections are specially challenging. In this paper we describe the conceptual design and simulation of an intratrain feedback system for CLIC. Results of luminosity performance simulation are presented and discussed.

Luminosity performance studies of the Compact Linear Collider with intra-train feedback system at the interaction point

Journal of Instrumentation 5:9 (2010)

Authors:

J Resta-L贸pez, PN Burrows, G Christian

Abstract:

To achieve the design luminosity at future linear colliders, control of beam stability at the sub-nanometre level at the interaction point will be necessary. Any source of beam motion which results in relative vertical offsets of the two beams at the interaction point may significantly reduce the luminosity from the nominal value. Beam-based intra-train feedback systems located in the interaction region are foreseen to correct the relative beam-beam offset and thus to steer the two beams into collision. These feedback systems must be capable of acting within the bunch train. In addition, these feedback systems might considerably help to relax the tight stability tolerances required for the final doublet magnets. For the Compact Linear Collider (CLIC), the extremely short nominal bunch spacing (0.5 ns) and very short nominal pulse duration (156 ns) make the intratrain feedback implementation technically very challenging. In this paper the conceptual design of an intra-train feedback system for the CLIC interaction point is described. Results of luminosity performance simulations are presented and discussed for different scenarios of ground motion. We also show how the intra-train feedback system can help to relax the very tight tolerances of the vertical vibration on the CLIC final doublet quadrupoles. 漏 2010 IOP Publishing Ltd and SISSA.

Present status and first results of the final focus beam line at the KEK Accelerator Test Facility

Physical Review Special Topics - Accelerators and Beams 13:4 (2010)

Authors:

P Bambade, M Alabau Pons, J Amann, D Angal-Kalinin, R Apsimon, S Araki, A Aryshev, S Bai, P Bellomo, D Bett, G Blair, B Bolzon, S Boogert, G Boorman, PN Burrows, G Christian, P Coe, B Constance, JP Delahaye, L Deacon, E Elsen, A Faus-Golfe, M Fukuda, J Gao, N Geffroy, E Gianfelice-Wendt, H Guler, H Hayano, AY Heo, Y Honda, JY Huang, WH Hwang, Y Iwashita, A Jeremie, J Jones, Y Kamiya, P Karataev, ES Kim, HS Kim, SH Kim, S Komamiya, K Kubo, T Kume, S Kuroda, B Lam, A Lyapin, M Masuzawa, D McCormick, S Molloy, T Naito, T Nakamura, J Nelson, D Okamoto, T Okugi, M Oroku, YJ Park, B Parker, E Paterson, C Perry, M Pivi, T Raubenheimer, Y Renier, J Resta-Lopez, C Rimbault, M Ross, T Sanuki, A Scarfe, D Schulte, A Seryi, C Spencer, T Suehara, R Sugahara, C Swinson, T Takahashi, T Tauchi, N Terunuma, R Tomas, J Urakawa, D Urner, M Verderi, MH Wang, M Warden, M Wendt, G White, W Wittmer, A Wolski, M Woodley, Y Yamaguchi, T Yamanaka, Y Yan, H Yoda, K Yokoya, F Zhou, F Zimmermann

Abstract:

ATF2 is a final-focus test beam line which aims to focus the low emittance beam from the ATF damping ring to a vertical size of about 37 nm and to demonstrate nanometer level beam stability. Several advanced beam diagnostics and feedback tools are used. In December 2008, construction and installation were completed and beam commissioning started, supported by an international team of Asian, European, and U.S. scientists. The present status and first results are described. 漏 2010 The American Physical Society.

Pagination

  • First page First
  • Previous page Prev
  • …
  • Page 37
  • Page 38
  • Page 39
  • Page 40
  • Current page 41
  • Page 42
  • Page 43
  • Page 44
  • Page 45
  • …
  • Next page Next
  • Last page Last

Footer Menu

  • Contact us
  • Giving to the Dept of Physics
  • Work with us
  • Media

User account menu

  • Log in

Follow us

FIND US

Clarendon Laboratory,

Parks Road,

Oxford,

OX1 3PU

CONTACT US

Tel: +44(0)1865272200

Department Of Physics text logo

漏 University of Oxford - Department of Physics

Cookies | Privacy policy | Accessibility statement

  • Home
  • Research
  • 51猎奇入口
  • Engage
  • Our people
  • News & Comment
  • Events
  • Our facilities & services
  • 51猎奇入口
  • Giving to Physics